Posted 4 September 2019, 7:05 am EST
Theming a C1DateEdit control using C1ThemeController - whether the one from C1Input or from Calendar - takes an awfully long time. In my tests, about 0.25 seconds in design time or 0.17 seconds at run time.
Is that what is expected or is there something that can be done about the speed?